Still waiting on my lift strut doublers. Chris is probably a Minnesota shut-in with sub-zero temps and deep snow. Meanwhile the crazy weather here in North Texas has beautiful days with temps in the mid 70's. Getting a lot of small things done.
With the port wing jigged-up on my engine hoist and shop stands (setting the sweep, dihedral and washout). I Started work on the port wing root. I used my new Milwaukee 2" metal hole saw to make the cutout in the rear spar root for the folding mechanism. The new saw worked great, far surpassing my hardware-store bargain-table saw. I cleaned up the slot with a fair amount of filing and will eventually prime and paint the root to match the white fuselage frame.
I then drilled each of the 8 spar root doublers (#30 bit) for the 4 BSPQ-44 rivets that attach each of them to the top and bottom of the spar roots. Then I laid out and drilled just 2 of the top doublers for the AN5 bolt/pin. After checking the fit, in turn, I secured each of the top and bottom doublers to the root end of the spars, drilled and clecoed the doublers in place. Once the new lift strut doublers arrive and I install the lift & jury struts setting the final sweep, dihedral, and washout, I will drill through the upper doubler and root mounting lugs; remove the doublers, deburr, prime and paint before final reassembly..
I have some questions about the but rib closeouts, flaperon cables, Oratex wing covering and trailering the folded wings. I'll post these in the DISCUSSION section.
More Small Things Getting Done
Moderators: Badland-F5 Pilot, LA F2 Flyer, ksatter26